Templates › Safe Work Method Statement (SWMS)
⚠️ Safe Work Method Statement (SWMS)
Document high-risk construction work activities, hazards, and control measures — required under NZ H&S regulations.
How to use: Complete a separate SWMS for each high-risk task before work starts. All fields are editable — click any text to change it.
Click to upload logo
SAFE WORK METHOD STATEMENT
Health & Safety at Work Act 2015. Complete a SWMS for each high-risk construction work activity. Workers must read and sign before starting.
Principal Contractor / PCBU
Business Name
Site Address
High-Risk Activity
Describe the high-risk work (e.g. working at heights, excavation, demolition, electrical work)
| Task Step | Hazard / Risk | Likelihood | Control Measure | Residual Risk |
|---|---|---|---|---|
| Step 1 | Describe hazard | High/Med/Low | Control measure to eliminate or minimise | Low |
| Step 2 | ||||
| Step 3 | ||||
| Step 4 | ||||
| Step 5 |
PPE Required
Hard hat, hi-vis vest, safety boots, gloves, safety glasses, harness (if working at height)
Emergency Procedures
Emergency contact: [Name / Phone]. First aid kit location: [Location]. Nearest hospital: [Name / address].
Worker Sign-Off (all workers must sign)
| Name | Role | Signature | Date |
|---|---|---|---|
